DEN Discussion List Archive
[Date Prev][Date Next][Date Index]
[Thread Index]
[Author Index]
SPC Problem
Daer Denizens,
I have got a problem on SPC. If anyone can help me, please mail
the solution directly to my personal mail account;
manoj@banas.guj.nic.in
Problem: Method engineer has proposed to introduce modification
to change specification limit by 0.5 sigma on either side. What
considerations must have gone into, before proposing such a
change?What would be effect of this change on process capability.
As Quality Engineer what steps would you take to ensure that all
the production lots are accepted with these modified limits.
Any solution ? Please help.
Manoj Sharma
India
Manoj Kumar Sharma
TQM-HRD CELL
Banas Dairy; Post Box No.20
Palanpur (Gujarat)-385001
Phone:+91-02742-53881 Ext.288
Fax:+91-02742-52723
"Winners don't do different things, they do things differently"
========================================================================
DEN Home |
Main Index |
Thread Index |
Author Index